CLIENT:
Woodcrest Chapel

SQUARE FOOTAGE:
27,700 SF

LOCATION:
Columbia, Missouri

Woodcrest Chapel’s youth building was designed to include three phases.

Phase 1 was completed in 2010 and includes a gymnasium, restrooms, open game area, group restrooms, storage, mechanical spaces, stairs, and an elevator. Phase 1 was designed and constructed to accommodate Phase 2 and Phase 3..

Phase 2 is preliminarily designed to include a double volume video room with camera platform, administrative office space, restrooms, and storage space.

Phase 3 is preliminarily designed to include a grand entrance into the building that relates to the main building as well as a hangout / gaming space, offices, a double volume multipurpose space with technical balcony.
Woodcrest Chapel Youth Building